HOW WE WORK

KEY STAGES OF OUR DESIGN PROCESS.

7

REGULATED BY RICS

We are regulated by the Royal Institution of Chartered Surveyors which is of the highest industry standards in terms of ethics and practice values.

1. TALK TO US

We need to understand your needs and your property before providing tailored advice. Complete or enquiry form or pick up the phone and discuss your project with us.

We will complete a quick desktop survey and provide you with the following:

  • Build options in terms of planning permission;
  • Requirements of the building regulations;
  • Our design fees;
  • Estimate fees for planning and building regulations applications;
  • Estimate fees for any additional parties e.g. structural engineers, SAP assessors, ground investigations etc.
  • Estimate build costs

By the end of the phone call you should have a guide to the design and construction of your project from initial ideas to appointing a contractor. All this information will be provided in an email with available appointment dates to move your project forward.

2. LET’S MEET

We will meet you for a Design Brief Site Visit. This includes:

  • In-depth discussion of design ideas, budget and the design and application process;
  • Measured survey of the property / site.

There is a fee for this meeting and this is why: we are not there to ‘sell’ you our services. At this meeting, you need honest, practical advice from a professional with a vast experience of construction. Anyone can take your ideas and draw a plan but if what you want to build doesn’t match your budget, the practicalities of building will be complex and costly or you are unlikely to achieve planning permission, we pride ourselves on having candid conversations because we work for you.

3. DRAFT DESIGNS

After our site visit, we get straight to work creating your initial layouts and draft designs. You then have the opportunity to review our work and make amendments. This phase is perhaps the most important where we work together to create a design you love.

N

Planning Permission Required

4. LET’S GET PERMISSION

Your planning drawings will be finalised and sent to you and submitted to the Local Authority (LA) for approval.

Your designs are frozen at this point. This means new changes cannot be made without needing to re-submit your planning application.

We will liaise with the LA on your behalf and put the best case forward to gain approval.

It can take 8-12 weeks to receive a decision.

Once we have the approval, we progress to step 5.

M

Planning Permission NOT Required

5. DESIGN HANDOVER

Once you are happy with your design, important technical information and design details will be added.

Your building regulations drawings will be provided to you with a breakdown of next steps.

Any additional supporting information such as structural calculations will be provided at this point.

This is the information your contractors will read not only to provide accurate costs but also as instructions of how the project should be constructed and the types of materials to be used.

Finally, this information should also be submitted to a Building Control Body for building regulations approval before any works can commence.

Get A Quote Today

Call us today on 01257 433893 for a free consultation

GET A QUOTE

ENQUIRE TODAY

Every project and every client’s circumstances are unique. We find the best way to get to know you and what you need is through a chat over the phone. Please take a few moments to complete the enquiry form and we will get in touch to see how we can help.